Reviews from M. Frick (2)

  • Bridge comment on Dr. Sally Ride Memorial (NASA Causeway) Bridge

    Comment by: M. Frick, Allure, on Apr 5, 2024
    Vessel Type: Sail
    LOA: 48'

    Bridge construction still underway for a second span. No clearance still but we passed northbound (approx. 64.5 air draft) without touching the whip antennae. Passed under the main span, which is the only one with lights attached at top (It was a bit hard to discern with construction barriers in place).

    View location on the Waterway Guide Explorer


  • Bridge comment on Bennett Causeway Bridges

    Comment by: M. Frick, Allure, on Apr 5, 2024
    Vessel Type: Sail
    LOA: 48'

    Our airdraft is 64.5, and we cleared northbound with clearance showing about 65'.
    Southbound board stopped at 63' mark but you can estimate from that point.

    View location on the Waterway Guide Explorer