Reviews from Leif Duvall (1)

  • Bridge comment on Onslow Beach Swing Bridge

    Comment by: Leif Duvall on Mar 25, 2024
    Vessel Type: Sail
    LOA: 42'

    3-25-24 at 4:35 PM Confirmed with bridge operator: from 7AM to 7PM Onslow Bridge will only open on the top of the hour.

    View location on the Waterway Guide Explorer