Modal title
Modal body text goes here.
Log In
Causton Bluff (Sam Varnedoe) Bascule Bridges
- Mile Marker: Mile 579.9
- Lat / Lon: N 32° 03.717' / W 081° 01.783'
- Bridge Type: Bascule
- Vertical Clearance (Closed): 65.00 ft.
- Horizontal Clearance: 100.00 ft.
- Schedule:
No longer operational. Leafs in open position. See nav alert posted.
Editor's Note: Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check the Waterway Explorer for possible nav alerts.
8 Boater Comments
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: Capt Maria Langer, Do It Now, on Dec 2, 2023
Vessel Type: Power
LOA: 32'
Draft: 2.5'This bridge is mostly deconstructed at this point. There is no remnant of the lift part of the bridge. They are still removing parts of the roadway on either side of the channel but the "bridge" no longer exists; you might consider removing it from the guide. I observed this in mid November 2023.
View location on the Waterway Guide Explorer
-
Comment by: Ray Sirois, Shellerina, on Jun 30, 2023
Vessel Type: Power
LOA: 39'
Draft: 4.0'Open 6/30/23
View location on the Waterway Guide Explorer
-
Comment by: John Morfit, Ashling, on Apr 1, 2022
Vessel Type: Sail
LOA: 47'
Draft: 4.0'USCG MSIB-0722 issued 4/1/2022 announces that the bascule repairs are complete and the bridge is re-opened.
View location on the Waterway Guide Explorer
-
Comment by: Robert Sherer on Feb 28, 2022
Vessel Type: Power
LOA: 42'
Draft: 5.0'Still not operable, no eta as of 6;00 pm 2/28/2022
View location on the Waterway Guide Explorer
-
Comment by: Valérie Martineau, SOLITUDE, on Dec 13, 2021
Vessel Type: Sail
LOA: 44'
Draft: 5.5'Someone should put new bridge on the map it is very confusing on approach.
View location on the Waterway Guide Explorer
-
Comment by: Robert Sherer on Nov 27, 2021
Vessel Type: Sail
LOA: 42'
Draft: 5.0'The bridge is being replaced by a 65 ft high bridge but in the meantime, one leaf has been left in the down position (on the port side when heading south). You only have half the normal width to pass through, Take great caution. The leaf that's left down is not visible when heading north.
View location on the Waterway Guide Explorer
-
Comment by: John Morfit, Ashling, on Nov 7, 2021
Vessel Type: Sail
LOA: 47'
Draft: 4.0'The new Island Expressway bridge slated for completion Nov 30 2021 is a fixed span bridge with 65 foot clearance at MHW, and an approximately 200 foot wide fendered channel. See https://engineering.chathamcountyga.gov/Projects/ProjectDetail?id=9cd49f52-2a78-4ca1-b393-999c441cd12d
View location on the Waterway Guide Explorer
-
Comment by: J. Bowley, Bare Necessity , on Dec 19, 2020
Vessel Type: Power
LOA: 31'
Draft: 3.0'The Bridge Tender at Causton Bluff was extremely rude and acted as though we were an inconvenience. Then he began lowering the Bridge before we were through, I'm assuming in an attempt to rush us.
View location on the Waterway Guide Explorer